What Documents Ship with a Machine (and What to Ask for Before You Sign)
Manual, drawings, I/O list, spare-parts list, FAT report, packing list. Missing one of these turns commissioning into a month of emails.
The Standard Set
Every machine ships with an operation manual, an electrical drawing set, the I/O list, a spare-parts list with part numbers, a packing list and the datasheet for the model. For cells we add the layout drawing, the pneumatic diagram and the FAT report from the factory test.
Ask for These Before the PO
The manual in your language, the electrical drawings in a editable format, the PLC program source or at least the archive, and the calibration values for the robot. These are the four things that are hard to obtain after the invoice is paid — ask while you still have leverage.
CE and Declarations
A standalone robot and a complete cell are declared differently: the cell integrator takes responsibility for the CE marking of the assembly. We supply the declarations that match what we ship, and for turnkey cells the CE file is part of the package — state the destination country and the intended use at quotation so the documentation matches.
Keep the FAT Report
The factory acceptance test record — cycle time, repeatability checks, safety function tests — is the baseline for the site acceptance test. Without it, every commissioning argument becomes opinion.
Questions We Get Asked
Do you provide drawings in DWG?
Layout and foundation drawings yes; electrical drawings are normally PDF and can be supplied in editable format on request.
Is the manual translated?
English as standard. Other languages are quoted with the order — ask early, translation is on the critical path.
What if a document is missing on arrival?
Send the packing list and the serial number; we reissue from the build file the same week.
Machines This Applies To
- 165 kg Palletizing Robot, 3,000 mm ReachTR10165B-310 · 20 days
- 300 kg CTU Mobile Robot for Rack HandlingTR-CTU300 · 35–45 days
Ask an engineer about your case
Keep Reading
- Glass facade cleaning robots: what a building actually has to provideThe robot is the small part of the decision. Anchors, water, roof access, wind limits and the contract with the cleaning crew decide whether it ever gets used.
- Exoskeleton selection: passive or powered, and which body part actually hurtsPassive units borrow energy from posture; powered units add torque. The right choice depends on the task duration, the load, and whether the worker walks or stands.
- AMR navigation: SLAM, QR codes and VDA 5050 explained without the brochureThree ways a mobile robot knows where it is, what each costs you in floor preparation, and which one survives a warehouse that changes layout twice a year.