Skip to content
Sales engineers online · 09:00–21:00 CST Bao'an, Shenzhen, China
Solutions · Intralogistics

Warehouse AMR Fleets

An AMR fleet usually replaces 30–50% of internal transport labour and reduces picking travel by 40%. Fleet size is driven by peak-to-average ratio and charging strategy, not by aisle count alone.

The problem

Forklift Traffic, Picking Travel and Shift Handovers Cap Throughput Before the Racking Does.

Map the real routes, size the fleet for peak, then integrate with WMS over VDA 5050 so orders flow without manual dispatch.

  • 300 kg to 40 t platforms
  • SLAM — no tape or reflectors
  • VDA 5050 / REST to WMS
  • Opportunity charging, 24/7 duty

Short Answer

An AMR fleet usually replaces 30–50% of internal transport labour and reduces picking travel by 40%. Fleet size is driven by peak-to-average ratio and charging strategy, not by aisle count alone.

300 kg to 40 t platformsSLAM — no tape or reflectorsVDA 5050 / REST to WMSOpportunity charging, 24/7 duty
Sizing

What Changes the Price

Payload
30–800kg
Case weight × 1.3 for acceleration
Reach
1.8–3.2m
Far pallet corner + 150 mm
Rate
900–1,800/h
Cycles per hour, sustained
Payback
8–14mo
Two-shift operation, 1,000 units/shift

Recommended Platforms

Shortlist from the catalogue; all prices are FOB Shenzhen.

Not sure which one? Send the part drawing and rate — we return a cycle estimate within 48 h.

FAQ

Buyer Questions

How long does deployment take?

A 10-unit fleet is typically live in 4–6 weeks including mapping and WMS integration.

Do we need to change the floor?

No for SLAM models; only charging stations need power drops.

Can it share aisles with people?

Yes — SIL2 scanners and speed zones are configured during commissioning.

ROI Estimate

Simple payback—

Illustrative only. Excludes maintenance, financing and ramp-up.

TROY AssistantSales engineer · replies in seconds
Hi — I’m TROY’s sales engineer bot.
Tell me what you need to automate: part weight, reach or cycle time is enough. I answer in your language and can put you in front of a human engineer in 48 h.
No prices published — quotation per configuration within 48 h · quote form