What to Measure Before You Buy a Robot.
One question per page, answered at the top, with the numbers taken from our own catalogue — payloads, reaches and lead times, not brochure claims. Written for the engineer who has to justify the purchase.
What Documents Ship with a Machine (and What to Ask for Before You Sign)
Manual, drawings, I/O list, spare-parts list, FAT report, packing list. Missing one of these turns commissioning into a month of emails.
Glass Facade Cleaning Robots: What a Building Actually Has to Provide
The robot is the small part of the decision. Anchors, water, roof access, wind limits and the contract with the cleaning crew decide whether it ever gets used.
Exoskeleton Selection: Passive or Powered, and Which Body Part Actually Hurts
Passive units borrow energy from posture; powered units add torque. The right choice depends on the task duration, the load, and whether the worker walks or stands.
AMR Navigation: SLAM, QR Codes and VDA 5050 Explained without the Brochure
Three ways a mobile robot knows where it is, what each costs you in floor preparation, and which one survives a warehouse that changes layout twice a year.
Machine Tending Cell: The Eight Things to Measure Before You Ask for a Quote
Part weight, cycle time, chuck height, door type, chip protection, buffer size, operator access and voltage. Get these wrong and the cell is rebuilt on site.
Robot Lead Times: What Actually Takes the Time
A stock arm ships in 15–20 days. An engineered cell takes 45–90. Here is where the weeks go, by product family, using the lead times published on our own product pages.
Cobot or Industrial Robot: The Weight Is the Deciding Line
Below roughly 20 kg and slow speeds a cobot removes the fence and the integrator. Above it, an industrial arm is cheaper per kilo and faster per cycle.
How to Specify a Palletizing Robot in Four Numbers
Pallet size, case weight, stack height and cases per minute decide the arm. Everything else — gripper, safety, software — follows from those four.