Robot ROI Calculator

Payback in months and the net after 5 years, from the numbers a plant manager already knows. Every assumption is printed beside the result so the answer can be argued with.

Inputs

% of planned hours the cell runs
% of cell price per year
% of the saving achieved in service

Illustrative. Excludes integration, fixtures, training, power and financing.

Payback
19.1mo
Cell price ÷ net monthly saving
Net saving
3,401US$/mo
After uptime, ramp and maintenance
Net 5 yr
139k US$
Cumulative, cell price deducted
Normal for a first cell in a two-shift plant.

Where the Number Comes From

Labour replaced / monthUS$ 4,8002 operators × 2 shift(s) × US$ 1,200
Effective saving / monthUS$ 3,672labour × 90% uptime × 85% ramp
Maintenance / monthUS$ 2715% of the cell price, per year
Net saving / monthUS$ 3,401effective saving − maintenance
Payback19.1 monthscell price ÷ net monthly saving
Net after 5 yearsUS$ 139,070net saving × 12 × 5 − cell price
Labour cost per operator-hourUS$ 6.82loaded cost ÷ 176 h

Get This Written Up

Send the scenario and an engineer returns the same calculation with the integration cost, the cycle-time estimate and the scope filled in — one page, 48 h.

We reply within 48 h. No newsletter, no reseller list.

Reality check

What This Model Deliberately Leaves Out

Integration, Not Just the Arm

The arm is typically 30–50% of a cell. Fixtures, fencing, safety relays, fume extraction and commissioning are the rest — usually US$ 25–60k on a welding cell.

Quality and Scrap

A robot welds the same seam all shift. If scrap or rework is above 3%, that saving is often larger than the labour line and is not counted here.

Ramp, Not Day One

Most plants reach full rate in month three. The 85% default is a service-life average, not the commissioning month.

Utilisation

A cell fed half-empty is not a bad robot. If order intake is lumpy, shorten the duty or keep a manual station beside it — that decision changes the payback more than any price.

FAQ
Is the payback gross or net of running costs?

Net of maintenance, and scaled by uptime and ramp. It excludes integration, power, consumables and financing, which is why the result is a filter for a study rather than an approval.

What payback is normal for a first cell?

Eight to fourteen months on a two-shift welding or palletising cell is what TROY quotes in a study. Above 24 months, either the labour content or the rate is usually overstated.

Why include uptime and ramp separately?

A cell that runs 90% of planned hours and reaches 85% of the theoretical saving is a different business case from one that runs flat out on paper. Both numbers are visible, so both can be challenged.

Does this replace a quotation?

No. Prices are quoted per configuration because the cell scope decides them. This tool tells you whether the scope is worth asking for.

TROY AssistantSales engineer · replies in seconds
Hi — I’m TROY’s sales engineer bot.
Tell me what you need to automate: part weight, reach or cycle time is enough. I answer in your language and can put you in front of a human engineer in 48 h.
No prices published — quotation per configuration within 48 h · quote form