Robot ROI Calculator
Payback in months and the net after 5 years, from the numbers a plant manager already knows. Every assumption is printed beside the result so the answer can be argued with.
Inputs
Where the Number Comes From
| Labour replaced / month | US$ 4,800 | 2 operators × 2 shift(s) × US$ 1,200 |
|---|---|---|
| Effective saving / month | US$ 3,672 | labour × 90% uptime × 85% ramp |
| Maintenance / month | US$ 271 | 5% of the cell price, per year |
| Net saving / month | US$ 3,401 | effective saving − maintenance |
| Payback | 19.1 months | cell price ÷ net monthly saving |
| Net after 5 years | US$ 139,070 | net saving × 12 × 5 − cell price |
| Labour cost per operator-hour | US$ 6.82 | loaded cost ÷ 176 h |
Get This Written Up
Send the scenario and an engineer returns the same calculation with the integration cost, the cycle-time estimate and the scope filled in — one page, 48 h.
What This Model Deliberately Leaves Out
Integration, Not Just the Arm
The arm is typically 30–50% of a cell. Fixtures, fencing, safety relays, fume extraction and commissioning are the rest — usually US$ 25–60k on a welding cell.
Quality and Scrap
A robot welds the same seam all shift. If scrap or rework is above 3%, that saving is often larger than the labour line and is not counted here.
Ramp, Not Day One
Most plants reach full rate in month three. The 85% default is a service-life average, not the commissioning month.
Utilisation
A cell fed half-empty is not a bad robot. If order intake is lumpy, shorten the duty or keep a manual station beside it — that decision changes the payback more than any price.
Is the payback gross or net of running costs?
Net of maintenance, and scaled by uptime and ramp. It excludes integration, power, consumables and financing, which is why the result is a filter for a study rather than an approval.
What payback is normal for a first cell?
Eight to fourteen months on a two-shift welding or palletising cell is what TROY quotes in a study. Above 24 months, either the labour content or the rate is usually overstated.
Why include uptime and ramp separately?
A cell that runs 90% of planned hours and reaches 85% of the theoretical saving is a different business case from one that runs flat out on paper. Both numbers are visible, so both can be challenged.
Does this replace a quotation?
No. Prices are quoted per configuration because the cell scope decides them. This tool tells you whether the scope is worth asking for.