
300 kg CTU Mobile Robot for Rack Handling
The TR-CTU300 is a mobile robot for E-commerce picking / spare parts. Key specifications: Payload 300 kg; Lift 45 mm; Speed 2.0 m/s. Lead time is 35–45 days; pricing is quoted per configuration.Certifications: CE documentation on request.
- Model
- TR-CTU300
- Payload
- 300 kg
- Lift
- 45 mm
- Speed
- 2.0 m/s
- Navigation
- QR / SLAM hybrid
- Battery
- 6 h
What This Platform Is For
A CTU (carton transfer unit) that drives under shelving, lifts the whole rack and delivers it to a picking station. 300 kg capacity, 45 mm lift and 2 m/s travel for e-commerce and spare-parts warehouses.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 35–45 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
A CTU (carton transfer unit) that drives under shelving, lifts the whole rack and delivers it to a picking station. 300 kg capacity, 45 mm lift and 2 m/s travel for e-commerce and spare-parts warehouses.
Key figures
- Payload: 300 kg
- Lift: 45 mm
- Speed: 2.0 m/s
- Navigation: QR / SLAM hybrid
- Battery: 6 h
- Rack sizes: up to 1,200 × 1,000 mm
Typical applications
- E-commerce picking
- Spare parts
- Pharma warehousing
- Micro-fulfilment
TR-CTU300 · Mobile Robots & AMR · lead time 35–45 days.
Before You Specify This Machine
What to measure, what the lead time covers, and which number decides the model — written by the engineers who quote it.
- What documents ship with a machine (and what to ask for before you sign)Manual, drawings, I/O list, spare-parts list, FAT report, packing list. Missing one of these turns commissioning into a month of emails.
- Robot lead times: what actually takes the timeA stock arm ships in 15–20 days. An engineered cell takes 45–90. Here is where the weeks go, by product family, using the lead times published on our own product pages.
Full Technical Data
| Model | TR-CTU300 |
|---|---|
| Payload | 300 kg |
| Lift | 45 mm |
| Speed | 2.0 m/s |
| Navigation | QR / SLAM hybrid |
| Battery | 6 h |
| Rack sizes | up to 1,200 × 1,000 mm |
| Interface | WMS API |
| Safety | CE, laser bumper |
| Category | Mobile Robots & AMR |
| Lead time | 35–45 days |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
Can it work with existing racks?
Yes if the base clearance is 80 mm or more; we supply adapters otherwise.
Get a Priced Proposal for TR-CTU300
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
30 T Heavy-Load AMR Platform
2 T Autonomous Forklift AMR
40 T Outdoor AMR Trailer
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.