AMR Navigation: SLAM, QR Codes and VDA 5050 Explained without the Brochure
Three ways a mobile robot knows where it is, what each costs you in floor preparation, and which one survives a warehouse that changes layout twice a year.
SLAM: No Floor Work, Needs Features
A SLAM robot builds its own map from laser scans. Nothing is glued to the floor, so a layout change is a remap, not a construction job. The catch: long empty aisles with bare walls give the scanner little to hold on to, and glass or mirrors confuse it. Warehouses with racking and pallets map well; empty new buildings sometimes need a few reflective targets.
QR / Fiducial: Cheap, Precise, Brittle
QR-coded floor plates give repeatable docking accuracy of a few millimetres for a fraction of the robot cost — which is why car-parking AMRs and high-bay CTUs use them. The cost moves to the floor: laying, protecting and re-laying plates when the layout changes. Choose it when docking precision matters more than flexibility.
VDA 5050: The Fleet Question
VDA 5050 is the German interface standard that lets robots from different makers share one fleet manager. It matters the day a site buys its second brand. Ask before you buy: a robot without VDA 5050 will run, but it will only ever be coordinated by its own vendor's software.
What to Measure Before Quoting
Aisle width, floor flatness, ramp gradients, the number of pick faces, charging position, WiFi coverage in every corner the robot will drive, and the heaviest load. Our range runs from 80 kg to 40 t; the 300 kg jack-up SLAM unit ships in about 7 days, a 2 t AMR forklift in 45.
Questions We Get Asked
Do AMRs need WiFi?
For fleet coordination, yes — and it has to work where the robot drives, not only at the desk. Single-robot installations can run offline with a local map.
Can an AMR drive between buildings?
Outdoor models with IP-rated chassis and GNSS exist in our range (8 t and 40 t trailers). Indoor SLAM units should not leave the building.
What floor do I need?
Flat, dry and free of steps; most units handle small thresholds and 3–5 % ramps. Send the floor plan and we check the route.
Machines This Applies To
- Laser SLAM Jack-up AMRTR-300J · 7 days
- Easy deploy of 300kg payload AMR RobotTAMR-300B · 15 days
- SEER 2 ton of AMR Forklift CPD20TR-CPD20 · 45 days
Ask an engineer about your case
Keep Reading
- What documents ship with a machine (and what to ask for before you sign)Manual, drawings, I/O list, spare-parts list, FAT report, packing list. Missing one of these turns commissioning into a month of emails.
- Glass facade cleaning robots: what a building actually has to provideThe robot is the small part of the decision. Anchors, water, roof access, wind limits and the contract with the cleaning crew decide whether it ever gets used.
- Exoskeleton selection: passive or powered, and which body part actually hurtsPassive units borrow energy from posture; powered units add torque. The right choice depends on the task duration, the load, and whether the worker walks or stands.