Knowledge base
What to Measure Before You Buy a Robot.
One question per page, answered at the top, with the numbers taken from our own catalogue — payloads, reaches and lead times, not brochure claims. Written for the engineer who has to justify the purchase.
What Documents Ship with a Machine (and What to Ask for Before You Sign)
Manual, drawings, I/O list, spare-parts list, FAT report, packing list. Missing one of these turns commissioning into a month of emails.
Robot Lead Times: What Actually Takes the Time
A stock arm ships in 15–20 days. An engineered cell takes 45–90. Here is where the weeks go, by product family, using the lead times published on our own product pages.