Skip to content
Sales engineers online · 09:00–21:00 CST Bao'an, Shenzhen, China
Home/Products/CNC & Motion Control/CNC & Motion Control
CNC & Motion Control Used cnc second hand machine
CE documentation on request
CNC & Motion Control · CNC & Motion Control

Used Cnc Second Hand Machine

CNC & Motion Control · Lead time 7 days

The Used cnc second hand machine is a CNC machine for CNC machining / motion control. Key specifications: Power 11 kW. Lead time is 7 days; pricing is quoted per configuration. Certifications: CE documentation on request.

Model
NONE
Power
11 kW
Category
CNC & Motion Control
Lead time
7 days
Price on requestPriced per configuration · quotation within 48 hours · FOB Shenzhen · MOQ 1 unit
CE file includedFAT before shipmentSpare parts 7 years3-year warranty option
Engineer review: send the part drawing and target rate — we return a cycle estimate and fixture concept with the quote.

What This Platform Is For

CNC Machine of Main Parts by: *The body weight is 855kg. *Mitsubishi M80 system. *11KW10000 rpm. used cnc second hand machine is supplied by TROY from Shenzhen with OEM options, documentation and export packing.

CNC machiningMotion controlRetrofitsAutomation

Commercial Terms

QuotationPriced per configuration — reply within 48 hours
Lead time7 days
MOQ1 unit
OriginChina
Port of loadingShenzhen, China
IncotermFOB Shenzhen / CIF on request
Payment30% deposit, 70% before shipment
Warranty24 months standard, 36 months optional
CNC & Motion Control · CNC & Motion Control

Product Details

Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.

Hot supplying Used CNC machine center equipments from close down factories with 80-90% of new conditions !!!

second hand cnc machine

C-shaped frame structure, high rigidity benchmark
Improved design of C-frame structure, X-axis movable table
Highly rigid Y-axis structure throughout the stroke
Design and manufacture through FEM finite element optimization

second hand cnc machine

Comprehensive high-precision components and exquisite details
Repeat positioning accuracy is better than 4um
Temperature compensation to ensure a stable, precise and high-quality production process
Ball screws with first tolerance (IT1)
CMX Vc series vertical machining centers combine the advantages of advanced design, compact structure and large processing area

second hand cnc machine

Greater operating comfort and easy loading and unloading of heavy workpieces
Large table 900 x 560 mm for workpieces weighing up to 600 kg
Covers an area of only 5.9 m2
Or choose FANUC's 3D CNC system at will!
Create tailor-made solutions
15″ DMG MORI SLIMline control panel and MAPPS version FANUC CNC system, providing 3D simulation contour verification function

Specifications

Full Technical Data

ModelNONE
Power11 kW
CategoryCNC & Motion Control
Lead time7 days

Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.

Applications

Where It Runs

CNC machining

Sized and commissioned by TROY engineers.

Motion control

Sized and commissioned by TROY engineers.

Retrofits

Sized and commissioned by TROY engineers.

Automation

Sized and commissioned by TROY engineers.

FAQ

Buyer Questions

What are the key specifications of the ?

Power: 11 kW. A full datasheet is available on request.

What is the lead time and MOQ for the ?

Lead time is 7 days; MOQ is 1 unit.

How is the priced?

Pricing is quoted per configuration, including tooling and freight where applicable.

Quote

Get a Priced Proposal for CNC & Motion Control

Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.

NDA on requestDrawings kept 24 monthsNo reseller calls

We reply within 48 h. No newsletter, no reseller list.

Related

Same Category

Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.

TROY AssistantSales engineer · replies in seconds
Hi — I’m TROY’s sales engineer bot.
Tell me what you need to automate: part weight, reach or cycle time is enough. I answer in your language and can put you in front of a human engineer in 48 h.
No prices published — quotation per configuration within 48 h · quote form