Skip to content
Sales engineers online · 09:00–21:00 CST Bao'an, Shenzhen, China
Home/Products/Other Machinery/By
By Earth Pressure Balance Tunnel Boring Machine
CE documentation on request
Other Machinery · By

Earth Pressure Balance Tunnel Boring Machine

By · Lead time 120 days

The Earth Pressure Balance Tunnel Boring Machine is a tunnel boring machine for packaging / filling. Lead time is 120 days; pricing is quoted per configuration. Certifications: CE documentation on request.

Model
By
Lead time
120 days
Category
Other Machinery
Price on requestPriced per configuration · quotation within 48 hours · FOB Shanghai · MOQ 1 unit
Material certificatesSample orderOEM / ODMExport packing
Engineer review: Send the drawing, tolerance and order quantity — we return a priced sample and material certificate.

What This Platform Is For

Earth Pressure Balance TBM: Muck is used as the main medium to balance the ground pressure on the tunnel excavation surface, and the slag is discharged through a screw conveyor. The excavation diameter covers 3 meters to 14 meters.

PackagingFillingAssembly lineEnd-of-line

Commercial Terms

QuotationPriced per configuration — reply within 48 hours
Lead time120 days
MOQ1 unit
OriginChina
Port of loadingShanghai, China
IncotermFOB Shanghai / CIF on request
Payment30% deposit, 70% before shipment
Warranty24 months standard, 36 months optional
Other Machinery · By

Product Details

Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.

tunnel boring machine

Earth Pressure Balance TBM features:

1. Suitable for clay, sand and soft and hard uneven composite strata, with high excavation efficiency and low construction cost;
2. With open, semi-open and closed excavation modes, each mode can be converted to each other;
3. With advanced and reliable cutterhead design and ballast improvement system;
4. Adopt reliable main bearings, main drive seals and main drive reducers, with long service life and high safety factor;
5. Safe and efficient PLC control system, real-time online monitoring and data acquisition.

tunnel boring machine

Name

Parameter

Type

TR6250   EPB TBM

TR10840   EPB TBM

TR9100   EPB TBM

TR6760   EPB TBM

TR8600   EPB TBM

TR4030   EPB TBM

TR5450   EPB TBM

Length / Weight

about 87m/ about 460t

about 68m/ about 1700t

about 116m/ about 1250t

about 75m/ about 500t

about 105m/ about 1150t

about 115m/ about 300t

about 240m/ about 780t

Cutter Head

Strip cutterhead,excavation dia. 6.28m

6 spokes compund cutterhead,excavation dia. 10.88m

soil cutterhead,excavation dia. 9.15m

soil cutterhead,excavation dia. 6.76m

heavy cutterhead,excavation dia. 8650mm

Spokes cutterhead,excavation dia. 4.06m

compund cutterhead,excavation dia. 5.5m,open ratioabout 50%

Main Drive

VF motor drive,rated torque 5700kNm

VF motor drive,rated torque 31056kNm

VF motor drive,rated torque 17960kNm

VF motor drive,rated torque 7660kNm

High Power VF motor drive,rated torque 20530kNm

Hydraulic power,rated torque 2900kNm

VF motor drive,rated torque 4010kNm

Articulation / Min. Turning radius

Active /250m

Passive /300m

Passive /500m

Active /200m

Passive /500m

Active + Passive

Active

Back-ups

1 bridge +6 gantries

Passive /300m

1 bridge +7 gantries

1 bridge +5 gantries

1 bridge +7 gantries

1 bridge +14 gantries

2 bridge +20 gantries + slope track

InstalledPower

about 1800kW

about 6000kW

about 4500kW

about 1500kW

about 4500kW

about 800kW

2400kW

Specifications

Full Technical Data

ModelBy
Lead time120 days
CategoryOther Machinery

Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.

Applications

Where It Runs

Packaging

Sized and commissioned by TROY engineers.

Filling

Sized and commissioned by TROY engineers.

Assembly line

Sized and commissioned by TROY engineers.

End-of-line

Sized and commissioned by TROY engineers.

FAQ

Buyer Questions

What are the key specifications of the By?

Model By. A full datasheet is available on request.

What is the lead time and MOQ for the By?

Lead time is 120 days; MOQ is 1 unit.

How is the By priced?

Pricing is quoted per configuration, including tooling and freight where applicable.

Quote

Get a Priced Proposal for By

Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.

NDA on requestDrawings kept 24 monthsNo reseller calls

We reply within 48 h. No newsletter, no reseller list.

Related

Same Category

Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.

TROY AssistantSales engineer · replies in seconds
Hi — I’m TROY’s sales engineer bot.
Tell me what you need to automate: part weight, reach or cycle time is enough. I answer in your language and can put you in front of a human engineer in 48 h.
No prices published — quotation per configuration within 48 h · quote form