The Earth Pressure Balance Tunnel Boring Machine is a tunnel boring machine for packaging / filling. Lead time is 120 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- By
- Lead time
- 120 days
- Category
- Other Machinery
What This Platform Is For
Earth Pressure Balance TBM: Muck is used as the main medium to balance the ground pressure on the tunnel excavation surface, and the slag is discharged through a screw conveyor. The excavation diameter covers 3 meters to 14 meters.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 120 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shanghai, China |
| Incoterm | FOB Shanghai / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.

Earth Pressure Balance TBM features:
1. Suitable for clay, sand and soft and hard uneven composite strata, with high excavation efficiency and low construction cost;
2. With open, semi-open and closed excavation modes, each mode can be converted to each other;
3. With advanced and reliable cutterhead design and ballast improvement system;
4. Adopt reliable main bearings, main drive seals and main drive reducers, with long service life and high safety factor;
5. Safe and efficient PLC control system, real-time online monitoring and data acquisition.

Name | Parameter | ||||||
Type | TR6250 EPB TBM | TR10840 EPB TBM | TR9100 EPB TBM | TR6760 EPB TBM | TR8600 EPB TBM | TR4030 EPB TBM | TR5450 EPB TBM |
Length / Weight | about 87m/ about 460t | about 68m/ about 1700t | about 116m/ about 1250t | about 75m/ about 500t | about 105m/ about 1150t | about 115m/ about 300t | about 240m/ about 780t |
Cutter Head | Strip cutterhead,excavation dia. 6.28m | 6 spokes compund cutterhead,excavation dia. 10.88m | soil cutterhead,excavation dia. 9.15m | soil cutterhead,excavation dia. 6.76m | heavy cutterhead,excavation dia. 8650mm | Spokes cutterhead,excavation dia. 4.06m | compund cutterhead,excavation dia. 5.5m,open ratioabout 50% |
Main Drive | VF motor drive,rated torque 5700kNm | VF motor drive,rated torque 31056kNm | VF motor drive,rated torque 17960kNm | VF motor drive,rated torque 7660kNm | High Power VF motor drive,rated torque 20530kNm | Hydraulic power,rated torque 2900kNm | VF motor drive,rated torque 4010kNm |
Articulation / Min. Turning radius | Active /250m | Passive /300m | Passive /500m | Active /200m | Passive /500m | Active + Passive | Active |
Back-ups | 1 bridge +6 gantries | Passive /300m | 1 bridge +7 gantries | 1 bridge +5 gantries | 1 bridge +7 gantries | 1 bridge +14 gantries | 2 bridge +20 gantries + slope track |
InstalledPower | about 1800kW | about 6000kW | about 4500kW | about 1500kW | about 4500kW | about 800kW | 2400kW |
Full Technical Data
| Model | By |
|---|---|
| Lead time | 120 days |
| Category | Other Machinery |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the By?
Model By. A full datasheet is available on request.
What is the lead time and MOQ for the By?
Lead time is 120 days; MOQ is 1 unit.
How is the By priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for By
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.