TROY
ShenZhen TROY Intelligent Robotics Co., Ltd.
Datasheet · 2026-11-18
[email protected]
[email protected]
By — Earth Pressure Balance Tunnel Boring Machine
Other Machinery · Price on request · 120 days
Earth Pressure Balance TBM: Muck is used as the main medium to balance the ground pressure on the tunnel excavation surface, and the slag is discharged through a screw conveyor. The excavation diameter covers 3 meters to 14 meters.
Specifications
| Model | By |
|---|---|
| Lead time | 120 days |
| Category | Other Machinery |
Export Terms
| Origin | China |
|---|---|
| Port of loading | Shanghai, China |
| Incoterm | FOB Shanghai / CIF, DDP on request |
| MOQ | 1 unit |
| Lead time | 120 days |
Applications
Packaging, Filling, Assembly line, End-of-line
Prototype datasheet. Figures are nominal; confirm with TROY engineering before ordering.