Skip to content
Sales engineers online · 09:00–21:00 CST Bao'an, Shenzhen, China
TROY
ShenZhen TROY Intelligent Robotics Co., Ltd.
Datasheet · 2026-11-18
[email protected]

By — Earth Pressure Balance Tunnel Boring Machine

Other Machinery · Price on request · 120 days

Earth Pressure Balance TBM: Muck is used as the main medium to balance the ground pressure on the tunnel excavation surface, and the slag is discharged through a screw conveyor. The excavation diameter covers 3 meters to 14 meters.

Specifications

ModelBy
Lead time120 days
CategoryOther Machinery

Export Terms

OriginChina
Port of loadingShanghai, China
IncotermFOB Shanghai / CIF, DDP on request
MOQ1 unit
Lead time120 days

Applications

Packaging, Filling, Assembly line, End-of-line

Prototype datasheet. Figures are nominal; confirm with TROY engineering before ordering.

TROY AssistantSales engineer · replies in seconds
Hi — I’m TROY’s sales engineer bot.
Tell me what you need to automate: part weight, reach or cycle time is enough. I answer in your language and can put you in front of a human engineer in 48 h.
No prices published — quotation per configuration within 48 h · quote form