
USB AA and AAA Battery Green Recycle Battery
The TRPNP is an automation system for packaging / filling. Key specifications: MOQ 500 units. Lead time is 30–60 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TRPNP
- MOQ
- 500 units
- Category
- Other Machinery
- Lead time
- 30–60 days
What This Platform Is For
AA Battery Standard Size: Diameter (D) mm 14 ± 0.5 Height (H) mm 50 ± 0.5 Weight(W) g 14.1 ± 0.5 A AA Battery Standard Size: Diameter (D) mm 10.1 ± 0.2 Height (H) mm 44.5 ± 0.5 Weight(W) g 7.1 ± 0.2
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 30–60 days |
| MOQ | 500 units |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
The Battery Basic Specifications:
NO. | Discription | Unit | Parameter | Note |
1 | Open circuit voltage | V | 1.5V(±0.5) | Under no load condition |
2 | Working Voltage | V | (1.4±0.5) | Battery is 80% charged, and the load is 0.5 ~ 1.0A |
3 | Cell specifications | V/mAh | 3.7/400 | Battery 1C discharge after standard charging |
4 | Battery Power | mWh | 1500 | (NSC_AA1.5V/1000mAh) |
5 | USB Charging Voltage | V | DC5.0 | USB Input DC/5V±0.2 |
6 | USB Charging Current | mA | 450 | USB Input DC5V/>0.5A |
7 | Standard Charging Time | Min | 60 | (IEC Standard) ndicator status: The R-LED blinks during charging, and the R-LED indicator stays on when fully charged. |
8 | Fast Charging time | Min | 45 | |
9 | Discharge Current | mA | Standard:400 (Max:1500) | |
10 | Discharge Time | Min | Standard:60 | Discharge time Min Standard: 60 Standard discharge time: 60 minutes (Discharge current 300mA) |
11 | Discharge cut-off voltage | V | 0.8V | |
12 | Cycle life | Cycle | 800 | 1C standard charge and discharge use. Restore the initial capacity ≥70% (referring to the standard charge and discharge of the battery cell) |
13 | Working temperature range | ℃ | -20~60 | |
14 | Storage ambient temperature | ℃ | -10~25 | -10 ~ 60 ℃ ≤30 days, -10 ~ 45 ℃ ≤90 days, -10 ~ 20 ℃ ≤360 days, the recovery capacity should not be less than 70% of the initial capacity. |
15 | Storage environment humidity | % | ≤85 | |
16 | Self-discharge rate per year | % | 10~15 | |
17 | Charging temperature rise | K | 16K | |
18 | Quiescent current | uA | 〈8 | |
19 | LED State | -- | R-LED | Flashes at 1Hz during charging, always on, full discharge, short circuit at 10Hz flashing |

Product safety test and mechanical characteristics:
NO. | Testing | Testing Description | Testing Requirement |
1 | Vibration test | Put a 100% charged battery on a vibration platform at room temperature and shake for 30 minutes according to the following parameters: | No cracking, no fire, no leakage |
2 | Short Circuit | After the battery is fully charged, a short-circuit current of 500A is passed to the battery for 60 seconds. | No explosion, no fire |
3 | Heavy object impact | After the battery is fully charged, place it on an impact table and drop it freely from a height of 0.61m with a 10kg weight hammer. | No explosion, no fire |
4 | Overcharge | The battery is discharged to 1.0V with a constant current of 1C at normal temperature, and then charged to 10V with a current of 3C, and ends when the current approaches 0mA. | No explosion, no fire |
5 | Squeeze | After the battery is fully charged, sandwich it between two metal plates and apply a force of 13KGF for 60 seconds. | No explosion, no fire |
6 | High and low temperature | Constant current and constant voltage 1C and 4.2V charge cut-off current 0.02C at room temperature, respectively at -20 ℃ \ -10 ℃ \ 0 ℃ \ 25 ℃ \ 60 ℃ (12 hours at low temperature, 2h at high temperature), 0.5C Discharge to 1.0V; test the discharge capacity of the battery. | Discharge capacity ≥ initial capacity * 70% |
7 | Charge retention | Measure the initial capacity of the battery using standard charge and discharge conditions, and then store the battery in a standard environment of 25 ± 5 ° C for 28 days after standard charging. Discharge at 1C to the end-of-discharge voltage to test the remaining capacity of the battery. Then test the battery's recoverable capacity according to standard charge and discharge conditions. | Remaining capacity ≥ initial capacity * 85% |
8 | Cell cycle test | Standard charge and discharge, cyclic test, until the discharge capacity is less than 70% of the initial capacity for two consecutive times, that is, the cycle life is considered to end | 800 times |
9 | Thermal shock | The fully charged battery is heated in a strong convection oven. The temperature of the oven is increased from room temperature to 130 ± 2 ° C at a rate of 5 ± 2 ° C / min, and the temperature is kept constant at this temperature for 10min. | No explosion, no fire |
10 | Drop | Drop a 100% charged battery from a height of 1.0m to a hardwood board of 18-20mm thickness placed on a concrete floor, and drop freely once in each direction | No cracking, no fire, no leakage |
11 | Plug test | Insertion force ≥1kg Extraction force ≤3.5kg Insertion speed 12.7mm / min | ≥1000 times |
12 | Insulation withstand voltage test | Apply a high voltage of 1200V / min to the product, and the leakage current is 0.5mA | No breakdown |

Shelf life and product liability
The warranty period is 12 months from the date of shipment (printing). The company is not responsible for accidents caused by failure to operate in accordance with the provisions of this specification. When there are some changes in this specification, the company will notify the buyer.Warnings and precautions when using the battery
To prevent possible battery leakage, heating, and explosion, please note the following precautions:
caveat!
• 1) Do not immerse the battery in seawater or water, and store it in a cool and dry environment when not in use.
• 2) Do not use or leave the battery near a source of heat or high temperature, such as fire or heater.
• 3) Never use the battery upside down.
• 4) Never insert the battery directly into a power outlet.
• 5) Do not throw batteries into fire or heater.
• 6) It is forbidden to directly connect the positive and negative terminals of the battery with metal.
• 7) It is forbidden to transport or store the battery with metal, such as hairpins, necklaces, etc.
• 8) Do not knock or throw, step on the battery, etc.
• 9) Do not directly weld the battery and pierce the battery with nails or other sharp objects.

Precautions:
• 1) Do not use or place the battery under high temperature (hot sunlight or in a hot car), otherwise it may cause the battery to overheat, function failure, and shorten the life.• 2) It is forbidden to use in places with strong static electricity and strong magnetic fields, otherwise it is easy to damage the battery safety protection device and bring unsafe hidden dangers.
• 3) If the battery leaks and the electrolyte enters the eyes, please do not rub it. Rinse the eyes with clean water and immediately send it to a doctor for treatment, otherwise it will hurt the eyes.
• 4) If the battery emits abnormal odor, heat, discoloration, deformation, or any abnormality during use, storage, or charging, immediately remove the battery from the device or charger and disable it.
• 5) If the electrode is dirty, wipe it with a dry cloth before use, otherwise it may lead to poor contact or functional failure; used batteries should be wrapped around the electrode to prevent short circuit, high temperature and fire!
Full Technical Data
| Model | TRPNP |
|---|---|
| MOQ | 500 units |
| Category | Other Machinery |
| Lead time | 30–60 days |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TRPNP?
MOQ: 500 units. A full datasheet is available on request.
What is the lead time and MOQ for the TRPNP?
Lead time is 30–60 days; MOQ is 500 units.
How is the TRPNP priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TRPNP
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Custom Shaped NdFeB Magnet
Custom Magnetic Rotor Assembly
Sintered Ferrite Ring Magnet Y30
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.