
Electric Motorcycles 5000W Motor Buid in Top Speed up to 120km/h
The TRMT-120 is a motorcycle for personal mobility / marine. Key specifications: Voltage 72 V. Lead time is 15 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TRMT-120
- Voltage
- 72 V
- Category
- Mobility & Marine
- Lead time
- 15 days
What This Platform Is For
Motorbike Dimensions : 2050*620*1160(mm) Gross Weight : 200kg Designed Spee d : Up to120km/h Motor input powe r : 72V 5000W
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 15 days |
| MOQ | 10 units |
| Origin | China |
| Port of loading | Ningbo, China |
| Incoterm | FOB Ningbo / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
TRMT-120 is TROY's electric mobility platform in the Mobility & Marine range, with voltage 72 V.














About the Electric Mobility Platform
TROY's mobility line covers electric motorcycles, scooters and utility vehicles for off-road, resort and fleet duty, with lead-acid or lithium packs and 3–7 kW motors.
Key figures as supplied: voltage 72 V.
Part of the Mobility & Marine line, alongside TR-XL500, ZX-820RR.
Integration
Range, gradeability and charging decide the configuration. Tell us the route profile and the daily distance and we size the battery to it.
Typical duty: Personal mobility, Marine, Resort transport, Tourism.
What to Send Us
To quote this electric mobility platform we need the route profile, daily distance, load and charging window. Send them once and the answer comes back as a priced proposal, not a brochure.
Ordering and Delivery
Price is quoted against your specification — send the requirement and we reply with a band. Lead time is 15 days for a standard configuration, confirmed at order. Minimum order is 10 units. Terms are FOB Shenzhen unless CIF is required; payment is 30% with the order and the balance before shipment. Each unit ships with its test record and a 24-month warranty, extendable to 36 months.
Full Technical Data
| Model | TRMT-120 |
|---|---|
| Voltage | 72 V |
| Category | Mobility & Marine |
| Lead time | 15 days |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TRMT-120?
Voltage: 72 V. A full datasheet is available on request.
What is the lead time and MOQ for the TRMT-120?
Lead time is 15 days; MOQ is 10 units.
How is the TRMT-120 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TRMT-120
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Off-Road Electric Motorcycle, 5 kW
80 Ft Luxury Yacht
Off-Road Road of Electric Motorcycle TR-XL5000D
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.