
Lower Limb Robotic Exoskeleton
The TRLE50-12 is an exoskeleton for logistics lifting / rehabilitation. Lead time is 15 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TRLE50-12
- Lead time
- 15 days
- Category
- Exoskeletons
What This Platform Is For
The lower limb exoskeleton Robot: The 12-degree-of-freedom lower limb power-assisted exoskeleton robot is fully electrically driven and can run for 5 hours without restrictions. Wearing it can easily carry 50kg and walk.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 15 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
TRLE50-12 is TROY's lower limb robotic exoskeleton in the Exoskeletons range.




About the Lower Limb Robotic Exoskeleton
An exoskeleton reduces load on specific joints rather than replacing the worker. TROY supplies passive and powered units for lifting, squatting and overhead work, sized by body range and duty cycle.
Part of the Exoskeletons line, alongside TR-EX-LB, TR-EX-W.
Integration
Fit matters more than motor power: a frame outside the wearer's range is taken off within a week. We size by task and shift length, not by catalogue.
Typical duty: Logistics lifting, Rehabilitation, Construction, Manufacturing.
What to Send Us
To quote this lower limb robotic exoskeleton we need the task, the load lifted, the shift length and the wearer's height range. Send them once and the answer comes back as a priced proposal, not a brochure.
Ordering and Delivery
Price is quoted against your specification — send the requirement and we reply with a band. Lead time is 15 days for a standard configuration, confirmed at order. Minimum order is 1 unit. Terms are FOB Shenzhen unless CIF is required; payment is 30% with the order and the balance before shipment. Each unit ships with its test record and a 24-month warranty, extendable to 36 months.
Before You Specify This Machine
What to measure, what the lead time covers, and which number decides the model — written by the engineers who quote it.
- Exoskeleton selection: passive or powered, and which body part actually hurtsPassive units borrow energy from posture; powered units add torque. The right choice depends on the task duration, the load, and whether the worker walks or stands.
Full Technical Data
| Model | TRLE50-12 |
|---|---|
| Lead time | 15 days |
| Category | Exoskeletons |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TRLE50-12?
Model TRLE50-12. A full datasheet is available on request.
What is the lead time and MOQ for the TRLE50-12?
Lead time is 15 days; MOQ is 1 unit.
How is the TRLE50-12 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TRLE50-12
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Lower-Limb Assist Exoskeleton
Waist Assist Exoskeleton for Lifting
Upper-Limb Assist Exoskeleton
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.