
Supercritical 1000MW Steam Turbine
The TR-ST1000MW is an automation system for packaging / filling. Lead time is 120 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TR-ST1000MW
- Lead time
- 120 days
- Category
- Other Machinery
What This Platform Is For
The double reheat ultra-supercritical 660MW steam turbine covers a power range of 600MW to 700MW, with steam inlet parameters ranging from 31MPa/600℃/610℃/610℃ to 35MPa/610℃/630℃/630℃.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 120 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shanghai, China |
| Incoterm | FOB Shanghai / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
Ultra-Supercritical 1000MW Steam Turbines

Ultra-supercritical 1000MW steam turbines are generally available in a single-shaft, four-cylinder, four-exhaust, or five-cylinder, six-exhaust configuration. They can accommodate various cooling methods, such as wet cooling or air cooling, and provide large steam extraction capacity to meet heating or industrial needs. Shanghai Electric continuously innovates and upgrades its products, achieving numerous firsts. Its product advantages in economy, safety, and flexibility have led the industry and earned widespread acclaim and recognition from customers.
Our ultra-supercritical 1000MW steam turbines cover a power range of 900MW to 1300MW, with steam inlet parameters ranging from 26.25MPa/600℃/600℃ to 30MPa/610℃/630℃.
As of June 2024, 108 ultra-supercritical 1000MW steam turbines have been ordered, 94 have been in operation, and three have been exported. The unit at the Yangxi Power Plant is currently the world's largest single-shaft unit.
Typical projects: Huaneng Yuhuan, Anqing, Beijiang, Jiahuwan, Shaanxi Energy Zhaoshipan, Fangjiazhuang, Yangxi, Caofeidian, etc.


Supercritical 600MW Steam Turbines
These supercritical 600MW steam turbines primarily come in three series: three-cylinder, four-exhaust, and two-cylinder, two-exhaust turbines with combined high and low pressures, and three-cylinder, two-exhaust, and four-cylinder, four-exhaust turbines with separate high and low pressures. These turbines are compatible with both wet and air cooling methods and can provide appropriate amounts of industrial and heating extraction steam.
Typical inlet steam parameters are 24.2MPa/566°C/566°C, with rated back pressures ranging from 3.4kPa to 30kPa.
Over 100 units have been ordered and put into operation, including over 20 units exported overseas. Typical projects include Huaneng Weijiamao, Sahiwal, Pakistan, and Huaihu Coal and Power Tianji.

Double-reheat Ultra-Supercritical 1000MW Steam Turbine
The double-reheat ultra-supercritical 1000MW steam turbine is generally available in a single-shaft, five-cylinder, four-exhaust, or six-cylinder, six-exhaust configuration. It can accommodate various cooling methods, such as wet cooling or air cooling, and provides large steam extraction capacity to meet heating or industrial needs. We continuously innovates and upgrades its products, achieving numerous firsts. Its product advantages in economy, safety, and flexibility have led the industry, earning widespread acclaim and recognition from customers. Currently, our double-reheat products hold over 80% of the market share of ultra-supercritical double-reheat steam turbine units in operation in China. Shanghai Electric's double-reheat ultra-supercritical 1000MW steam turbines cover a power range of 900MW to 1100MW, with steam inlet parameters ranging from 31MPa/600℃/610℃/610℃ to 35MPa/610℃/630℃/630℃.
As of June 2024, 65 double-reheat ultra-supercritical 1000MW steam turbines have been ordered, with 22 in operation. Among them, the Guodian Taizhou unit is the world's first double-reheat 1,000MW-class unit.
Typical projects include Guodian Taizhou, Huaneng Laiwu, Huaneng Ruijin, and Datang Dongying.

Subcritical 300MW Steam Turbines
Our offers over 15 subcritical 300MW steam turbine models to meet diverse client needs. These primarily feature two-cylinder, two-exhaust turbines with combined high and low pressure cylinders, with a limited number of three-cylinder, two-exhaust turbines with separate high and low pressure cylinders. These turbines are compatible with both wet and air cooling methods and can provide industrial and heating extraction steam. These turbines are currently primarily targeted at overseas markets.
Typical inlet steam parameters are 16.7MPa/538°C/538°C, with rated back pressures ranging from 4.9kPa to 30kPa.
Over 300 units have been ordered and commissioned, including over 40 units exported. Typical projects include Balingian, Malaysia; Wasteland, Iraq; Puteri Harbour, Indonesia; and Polyplastics Phase III.

Supercritical 350MW Steam Turbine
To meet the diverse needs of different users, the supercritical 350MW steam turbine product line offers a variety of models, including a two-cylinder, two-exhaust model with combined high and low pressure cylinders, and a three-cylinder, two-exhaust model with separate high and low pressure cylinders. These turbines are compatible with both wet and air cooling methods and can provide industrial and heating steam extraction. They have won numerous awards, including the Gold Medal in the Shanghai Excellent Invention Competition and the Third Prize in the China Machinery Industry Science and Technology Award.
Typical steam inlet parameters are 24.2MPa/566℃/566℃ and 24.6MPa/569℃/569℃, with rated back pressures ranging from 3.4kPa to 30kPa.
As of June 2024, 126 supercritical 350MW steam turbines have been ordered, 79 are in operation, and over 20 have been exported.
Typical projects include Shaoguan Yuehua, Shaanxi Energy Linbei, China Merchants Qiu, and Tsingshan, Indonesia.

Full Technical Data
| Model | TR-ST1000MW |
|---|---|
| Lead time | 120 days |
| Category | Other Machinery |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TR-ST1000MW?
Model TR-ST1000MW. A full datasheet is available on request.
What is the lead time and MOQ for the TR-ST1000MW?
Lead time is 120 days; MOQ is 1 unit.
How is the TR-ST1000MW priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TR-ST1000MW
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Custom Shaped NdFeB Magnet
Custom Magnetic Rotor Assembly
Sintered Ferrite Ring Magnet Y30
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.