
Automatic Nitrile Gloves Production Line
The TR-SBA80X8 is an automation system for packaging / filling. Key specifications: Main products Nitrile/PVC/Latex. gloves for. Lead time is 60 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TR-SBA80X8
- Main products
- Nitrile/PVC/Latex. gloves for
- Category
- Automation Equipment
- Lead time
- 60 days
What This Platform Is For
TR-SBA for single mold line TR-SBB for double mold line Main products: Nitrile/PVC/Latex. gloves for examination, surgery, disposable glove for household, and beading, straight (powder/ powder-free).
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 60 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shanghai, China |
| Incoterm | FOB Shanghai / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
Nitrile Gloves Production Lines
a. Complete supply and installation, turnkey, FDA standard nitrile medical glove factory and ASTM D6319 glove quality
b. Supply and installation (turnkey) 2 models TR-SPA110x6 and TR-SBB110x10 arranged in the customer plant.
c. Provide automatic packaging equipment system.
d. Provide glove quality testing system.
e. Training of plant management and operation personnel.
f. The product does not reach quality not more than 5%.
g. Product size should be manufactured according to the following ratios: 20% S: 30% M: 30% L: 20% XL
h. The seller is responsible for all installation personnel (the buyer will be introduced the installation subcontractor to the seller)
i. The seller commits not to disclose information of the buyer until one year after the factory hand-over date.
j. TT payment only by Buyer(50% deposite, 40% before on board, 10% after installation on site) after signing the contract to pay the seller.
k. The time from signing the contract to the date of handing over (turnkey) is not more than 5 months.










Full Technical Data
| Model | TR-SBA80X8 |
|---|---|
| Main products | Nitrile/PVC/Latex. gloves for |
| Category | Automation Equipment |
| Lead time | 60 days |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TR-SBA80X8?
Main products: Nitrile/PVC/Latex. gloves for. A full datasheet is available on request.
What is the lead time and MOQ for the TR-SBA80X8?
Lead time is 60 days; MOQ is 1 unit.
How is the TR-SBA80X8 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TR-SBA80X8
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Four-Color Cream Filling Machine
Universal Automatic Screw Feeding System and Tightening Module
Automatic Bun Making Machine TRB-140
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.