
Industrial Glove Production Line
The TR-RG01 is an automation system for packaging / filling. Lead time is 90 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TR-RG01
- Lead time
- 90 days
- Category
- Automation Equipment
What This Platform Is For
Household latex gloves production line: The Latex/Nitrile rubber solution of the household glove dipping machine is fed from the top of the distillation tower, and is distilled by steam heating. Dipping household latex gloves manufacturing equipment adopts the advanced technology and process formula design of Japanese and Korean cashmere glove production lines. The equipment.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 90 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shanghai, China |
| Incoterm | FOB Shanghai / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.

Our manufacturers develop, design and produce machines for gloves, balloons and condoms. Mainly balloon printing machine, glove production line, glove half body dipping production line, latex condom dipping production line, latex balloon dipping production line, glove dot printing machine, surgical glove outer packaging/inner paper packaging machine, condom packaging machine and other related supporting facilities Equipment products are the main products.

The gasoline soluble rubber solution of the household glove dipping machine is fed from the top of the distillation tower, and is distilled by steam heating. Dipping household latex gloves manufacturing equipment adopts the advanced technology and process formula design of Japanese and Korean cashmere glove production lines. The equipment structure is reasonable and suitable for various formulas.


Technical parameters:
Model | TR-RGA01 | TR-RGA02 | TR-RGB01 |
Machine size | 45*1.8*4m | 80*1.8*4m | 60m*6 tiers of chain |
Speed | 3.0 m/min | 6.0 m/min | 7.6 m/min |
Capacity | 1800pcs/hr | 3600pcs/hr | 4600pcs/hr |
Heat consumption | 400000kcal/hr | 600000kcal/hr | 750000kcal/hr |
Power | 25kw/hr | 48kw/hr | 55kw/hr |
Mold | 1800pcs | 3200pcs | 3600pcs |
Chain | 180m | 320m | 360m |
Weight | 30ton | 55ton | 70ton |










Full Technical Data
| Model | TR-RG01 |
|---|---|
| Lead time | 90 days |
| Category | Automation Equipment |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TR-RG01?
Model TR-RG01. A full datasheet is available on request.
What is the lead time and MOQ for the TR-RG01?
Lead time is 90 days; MOQ is 1 unit.
How is the TR-RG01 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TR-RG01
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Four-Color Cream Filling Machine
Universal Automatic Screw Feeding System and Tightening Module
Automatic Bun Making Machine TRB-140
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.