
Hot Supply of the Smart Electric Mask During COVID-19
The TR-eN95 is an automation system for packaging / filling. Key specifications: Power (W); Voltage (V). Lead time is 7 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TR-eN95
- Power
- (W):
- Voltage
- (V):
- Category
- Other Machinery
- Lead time
- 7 days
What This Platform Is For
OEM Electric mask: Power (W): 0.5W Voltage (V): 5V Power Source: Battery, usb, Electric Materials: PP and Silicone Function: Air purifier and anti-fog smoke virus
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 7 days |
| MOQ | 24 units |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.


--3 level smart switch button:to intake air it is customized according to the three lung capacities of sitting,walking, and
running to ensure that every breath you take is safe and comfortable.
--Waterproof design for outdoor application.

Specification:
Rated voltage: 5V
User manual*1

Single Package Size: 26X18X9 cm
Single Gross Weight:0.4 kg
Product size: 4.3*4.7*2.95inch /11*12*7.5cm
Package Type:
Carton quantity: 24pcs
Carton dimensions: 53*51.5*33cm
Carton Gross Weight:9.9KG

















Full Technical Data
| Model | TR-eN95 |
|---|---|
| Power | (W): |
| Voltage | (V): |
| Category | Other Machinery |
| Lead time | 7 days |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TR-eN95?
Power: (W):; Voltage: (V):. A full datasheet is available on request.
What is the lead time and MOQ for the TR-eN95?
Lead time is 7 days; MOQ is 24 units.
How is the TR-eN95 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TR-eN95
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Custom Shaped NdFeB Magnet
Custom Magnetic Rotor Assembly
Sintered Ferrite Ring Magnet Y30
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.