
Square Tissue Paper Automatic Production Line
The TR-120 is an automation system for packaging / filling. Lead time is 40 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TR-120
- Lead time
- 40 days
- Category
- Automation Equipment
What This Platform Is For
The research and development, production, sales and service of intelligent equipment for household paper provide customers with fully automatic intelligent equipment and comprehensive solutions for the manufacturing, processing and packaging of household paper.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 40 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.

Model | TR-120 |
Designing Speed(sheet/min) | 3000 |
Working Speed(sheet/min) | 2800 |
Raw paper specification(mm) | (width)406-420 |
Raw paper diameter(mm) | Raw paper diameter:1500 Raw paper inner diameter:76 |
Raw paper(mm) | 3.5-15.0GSM 3/4 Ply 18GSM 2 Ply |
Specification after folding(mm) | Length:100±2mm,Width:72mm (Depend on Raw paper size) |
Sheet/bag | 25、26、28... |
Outline Dimension | 9000x3900x1720 |
Machine’s Weight(kg) | 3000 |
Power (kw) | 50 |


Full Technical Data
| Model | TR-120 |
|---|---|
| Lead time | 40 days |
| Category | Automation Equipment |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TR-120?
Model TR-120. A full datasheet is available on request.
What is the lead time and MOQ for the TR-120?
Lead time is 40 days; MOQ is 1 unit.
How is the TR-120 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TR-120
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Four-Color Cream Filling Machine
Universal Automatic Screw Feeding System and Tightening Module
Automatic Bun Making Machine TRB-140
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.