
Bulletproof Glass for Cars Special Building and Bulletproof Shield
The TD33FD is a defence or security system for perimeter security / counter-UAS. Lead time is 15 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- TD33FD
- Lead time
- 15 days
- Category
- Defence & Security
What This Platform Is For
Bulletproof glass can be approved from the weapon model below: 1, M14 Automatic Rifle / 7.62mm NATO bullet 2, F56 submachine gun / 7.62mm steel core bullet 3, F79 light submachine gun / 7.62mm steel core bullet 4, F54 pistol / 7.62mm steel core bullet
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 15 days |
| MOQ | 3 units |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
Bulletproof glass is a composite material obtained by special processing of glass or plexiglass, PC and high-quality engineering plastics.It is usually a transparent material, such as PVB / polycarbonate thermoplastics (generally, resins, namely Lexan, also Called Lexan PC Resin). It can be optimized and compounded by special processes such as hot bending according to customer requirements. It has the appearance of ordinary glass and the behavior of transmitting light, and provides certain protection for the shooting of small arms.
Bulletproof principle: When the high-speed bullet hits the bullet-proof glass, the outer glass of the hitting part breaks, forming a radial crack, the warhead deforms, its kinetic energy is reduced and absorbed, it cannot penetrate the glass, and the glass fragments are stuck by the organic film, which is not easy to splash and hurt people.












Full Technical Data
| Model | TD33FD |
|---|---|
| Lead time | 15 days |
| Category | Defence & Security |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the TD33FD?
Model TD33FD. A full datasheet is available on request.
What is the lead time and MOQ for the TD33FD?
Lead time is 15 days; MOQ is 3 units.
How is the TD33FD priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for TD33FD
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
8-Channel Counter-Drone Detector
Laser Obstacle Remover, 2,000 W
Flying Life Buoy, 1 kg Payload
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.