
Automatic Coating Machine
The PEAK-FM-200 is an automation system for packaging / filling. Lead time is 15 days; pricing is quoted per configuration. Certifications: CE documentation on request.
- Model
- PEAK-FM-200
- Lead time
- 15 days
- Category
- Automation Equipment
What This Platform Is For
This machine can be applied to glass, light guideboard, touch panel and other industries of the coating process. All requirements for precise position requirements can be used.
Commercial Terms
| Quotation | Priced per configuration — reply within 48 hours |
|---|---|
| Lead time | 15 days |
| MOQ | 1 unit |
| Origin | China |
| Port of loading | Shenzhen, China |
| Incoterm | FOB Shenzhen / CIF on request |
| Payment | 30% deposit, 70% before shipment |
| Warranty | 24 months standard, 36 months optional |
Product Details
Application notes, construction drawings and video from the TROY engineering file — the same documentation shipped with the quotation.
Automatic coating machine (PEAK-FM-200)

Basic instructions
Model:PEAK-FM-200
1-2.The purpose of the device
This automatic coating machine can be applied to glass, light guideboard, touch panel and other industries of the coating process. All requirements for precise position requirements can be used.
1-3.Characteristics
1. The whole machine consists of X-axis, Y-axis and membrane shaft.
2. Place the glass manually. On the coating countertop, the positioning sheet or positioning pin is used to secure the glass first. The platform has vacuum. Holes to produce suction. Place the glass and press the rotation key, the platform rotates, waiting for the coating.
3. When the automatic key is pressed, Step 2 The action of releasing glass is carried out at the same time as the action of automatic membrane discharge. The membrane-out mechanism automatically films out of the membrane at the length set on the HMI interface. Each time the coating is finished, another film is automatically created.
4. After the film is finished, the positioning mechanism will go in for the positioning of the Y-axis. The positioning mechanism has 1 fiber, which is used first to locate the edges in the Y direction;
5. The device positions the Y-axis direction before pressing the coating button. Then make up in the direction of the Y-axis. If the setting value is greater than 0, the Y-axis direction compensation is made. The set distance in the direction of the Y-axis. After the Y direction positioning is complete, then the X-axis orientation positioning is carried out. Leave the fiber position first, and then position the X direction.
6. After the X-axis orientation positioning is complete, if the platform is transferred to the correct position, the coating mechanism will go to the set position and start the coating.
7. After the coating is complete,the X-Y axis returns to its original position and begins the next coating.
8. With the high-performance Panasonic FP-X Series PLCin Japan, it ishighly automated and integrated, reducing commissioning time and error-proofing. The operator interface uses a color touch man-machine interface. With 10 sets of operating mode memory addresses, it is easy to remember at the touch of a few switches and call up the set mode.
9. Equipped with other safety protection: error indication, automatic error prevention, emergency stop button, security protection.

1-4. Specification parameters:
Specifications | |
size (mm) | 1360 (W) * 840(L) *1600 (H) |
Weight(Kg) | 210Kg |
Environmental requirements | Reserved space: Leave at least 700 mm of space at the
front of the machine. |
Glass size(mm) | Length:50-200(Adjustable
according to customer requirements) |
Cycle time | 4.5S/PCS |
Accuracy | ±0.1mm |
How to calibrate | X/Y Axis Paramethration Correction |
System control | PLC and human-machine interface |
Power. | 220V 2KW |
1-5.Machine configuration
Name | Brand | Origin |
Servo motor | Panasonic | Japan |
Servo motor driver | Panasonic | Japan |
Fiber optic sensors | Omron | Japan |
Cylinder | SMC | Japan |
PLC | Panasonic | Japan |
Screw | Hiwin | Taiwan, China |
Rotating work table | Misumi | Japan |
Touch screen | Teda. | Taiwan, China |
Thousand-stage high-efficiency dust removal device (optional). | Futai | China |
Full Technical Data
| Model | PEAK-FM-200 |
|---|---|
| Lead time | 15 days |
| Category | Automation Equipment |
Values are nominal at 20 °C. Download the datasheet for cad models, torque curves and controller I/O maps.
Where It Runs
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Sized and commissioned by TROY engineers.
Buyer Questions
What are the key specifications of the PEAK-FM-200?
Model PEAK-FM-200. A full datasheet is available on request.
What is the lead time and MOQ for the PEAK-FM-200?
Lead time is 15 days; MOQ is 1 unit.
How is the PEAK-FM-200 priced?
Pricing is quoted per configuration, including tooling and freight where applicable.
Get a Priced Proposal for PEAK-FM-200
Include the part, target rate and destination port. An engineer — not a chatbot — replies within 48 hours.
Same Category
Four-Color Cream Filling Machine
Universal Automatic Screw Feeding System and Tightening Module
Automatic Bun Making Machine TRB-140
Reviewed by TROY Engineering · . Specifications are re-checked against the supplier datasheet at every quotation.