
Uppgradering och reparation av automatisk produktionslinje för nitrilhandskar
TR-SBB/SBA är ett automationssystem för förpackning/fyllning. Ledtiden är 30 dagar; priset anges per konfiguration. Certifieringar: CE-dokumentation på begäran.
- Modell
- TR-SBB/SBA
- Ledtid
- 30 dagar
- Kategori
- Automationsutrustning
Vad den här plattformen är till för
Automatic glove dipping line featu res: This machine by PLC program control with automatic and manual modes, its simple operation, small size, and use gloves Roller pull on gloves without any damage. Its normal use and low maintenance costs. Also without gas supply, the machine noise <40dB, safety, energy saving and environmental protection.
Kommersiella villkor
| Citat | Pris per konfiguration — svara inom 48 timmar |
|---|---|
| Ledtid | 30 dagar |
| MOQ | 1 enhet |
| Ursprung | Kina |
| Lastningshamn | Shanghai, China |
| Incoterm | FOB Shanghai / CIF on request |
| Betalning | 30% deposition, 70% före leverans |
| Garanti | 24 månader standard, 36 månader valfritt |
Produktdetaljer
Ansökningsnoteringar, konstruktionsritningar och video från TROY ingenjörsfilen — samma dokumentation som levererades med offerten.
Upgrading or Reparing your Nitrile/Latex glove production line !!!

Om du lider av trasig produktionslinje för nitril- eller latexdoppningshandskar, vänligen kontakta oss för att lösa dina aktuella problem!

Vår professionella ingenjörstjänst kan skickas till utomeuropeiska länder hos kunderglove manufacturers !

Vårt ingenjörsteam har arbetat med produktionslinjer för automatisk handdoppning i många år!

Vi fixar alla dessa nyckelfärdiga tjänster contract without sending any engineers to the site yet !!

Zero tolerance for who has been bortkastad tid på din automatnitrile gloves production line project on site !!

Vår tillverkare av dopplinjeutrustning för engångshygienprodukter för maskinutveckling, design och produktion, främst i produktionslinje för medicinska handskar, latexballonger, latexkondomer, nitrilhandske, fingertoppar, bearbetningsutrustning för engångsprodukter.

The nitrile/latex glove production main process:
The nitrile/latex glove production line uses natural latex or synthetic rubber as the main raw material and other chemicals as auxiliary materials.
The hand mold is cleaned with acid and alkali, and then cleaned with water again.
Then the cleaned hand mold is first immersed in hot water and heated then immersed into coagulant and dried for dipping.
After dipping, go into an oven for preliminary drying, flushed with hot water and then sent to another oven for curing and drying to form. After the gloves are demolded, they are inflated or filled with water for inspection, washed.centrifuged. and dried before packaging and sending them to the finished product warehouse.

Fullständiga tekniska data
| Modell | TR-SBB/SBA |
|---|---|
| Ledtid | 30 dagar |
| Kategori | Automationsutrustning |
Värdena är nominella vid 20 °C. Ladda ner databladet för cad-modeller, vridmomentkurvor och styrenhets I/O-kartor.
Där det går
Dimensionerad och beställd av TROY ingenjörer.
Dimensionerad och beställd av TROY ingenjörer.
Dimensionerad och beställd av TROY ingenjörer.
Dimensionerad och beställd av TROY ingenjörer.
Köparens frågor
Vilka är de viktigaste specifikationerna för TR-SBB/SBA?
Modell TR-SBB/SBA. Ett fullständigt datablad finns tillgängligt på begäran.
Vad är ledtiden och MOQ för TR-SBB/SBA?
Ledtiden är 30 dagar; MOQ är 1 enhet.
Hur är TR-SBB/SBA prissatt?
Priset anges per konfiguration, inklusive verktyg och frakt där tillämpligt.
Få ett prissatt förslag för TR-SBB/SBA
Inkludera del, målpris och destinationsport. En ingenjör – inte en chatbot – svarar inom 48 timmar.
Samma kategori
Fyrfärgad krämfyllningsmaskin
Universal automatiskt skruvmatningssystem och åtdragningsmodul
Automatisk bulltillverkningsmaskin TRB-140
Recenserad av TROY Engineering ·. Specifikationerna kontrolleras på nytt mot leverantörens datablad vid varje offert.