
Pedang Longquan
LQJ-008 adalah produk konsumen untuk konsumen ritel / gaya hidup. Spesifikasi utama: Berat kira-kira. Waktu tunggu adalah 30 hari; harga dikutip per konfigurasi. Sertifikasi: dokumentasi CE berdasarkan permintaan.
- Model
- LQJ-008
- Berat
- kira-kira:
- Kategori
- Mode & Konsumen
- Waktu memimpin
- 30 hari
Untuk apa platform ini
Panjang keseluruhan: 108cm; Panjang bilah: 73cm; Panjang pegangan: 29cm; Lebar bilah: 3,8cm; Ketebalan: 0,5cm; Perkiraan berat: 1300g; Bahan pisau: Baja mangan berkinerja tinggi; Bahan sarung: Pembungkus kayu solid; Berat tanpa sarung: 1000g; Bahan pegangan: Kayu padat; Kelengkapan kabel: PC-ABS.
istilah komersial
| Kutipan | Harga per konfigurasi — balas dalam 48 jam |
|---|---|
| Waktu memimpin | 30 hari |
| MOQ | 10 unit |
| Asal | Cina |
| Pelabuhan pemuatan | Shenzhen, Tiongkok |
| Incoterm | FOB Shenzhen / CIF berdasarkan permintaan |
| Pembayaran | Deposit 30%, 70% sebelum pengiriman |
| Jaminan | Standar 24 bulan, 36 bulan opsional |
Detail produk
Catatan aplikasi, gambar konstruksi, dan video dari file teknik TROY — dokumentasi yang sama dikirimkan bersama kutipan.

Legend has it that during the late Spring and Autumn Period, the State of Yue had a renowned swordsmith named Ou Yezi. He forged five swords for the King of Yue: Zhanlu, Chun Jun, Sheng Xie, Yu Chang, and Ju Que—all priceless and rare treasures. It is said that these five swords played a crucial role in the power struggle between the states of Wu and Yue, greatly enhancing Yue's reputation and leading to its rise in the southeast.
Many legends about Ou Yezi circulate in Longquan. The most widely circulated story is that when Ou Yezi's fame reached the State of Chu, the King of Chu, envious of his reputation, requested that the King of Yue commission Ou Yezi to forge swords. At that time, the King of Yue, in order to form an alliance with Chu to attack Wu, agreed to send Ou Yezi to forge swords for the King of Chu as a condition for the alliance. After receiving the King of Yue's promise, the King of Chu sent his minister Feng Huzi with Chu's treasures as gifts to the King of Yue to invite Ou Yezi to forge swords for him. To find the perfect place to forge iron swords, Ou Yezi traveled throughout the famous mountains and rivers of Jiangnan, passing through Jiangxi and Fujian, until he arrived in Longquan, China. He found the Qinxi Mountain south of the city lush and verdant, with a lake of several acres on its side and seven wells arranged like the Big Dipper beside it. The spring water was cold and clear, and there was no crowing of roosters or barking of dogs; the environment was tranquil and ideal for forging swords.
So Ou Yezi dug a hole in the mountain to drain the water, built a furnace, and collected iron sand from the stream. He used charcoal from the mountain forest as fuel to forge the swords. After countless hammerings, he quenched the swords with lake water and then went deep into the mountains to find "bright stones" to sharpen them. After three years of painstaking effort, Ou Yezi finally completed his mission and forged three peerless swords for the King of Chu, each gleaming with a cold light and incredibly sharp. Based on the different patterns on the three swords, the King of Chu's minister, Feng Huzi, named them Longyuan, Qin'a, and Gongbu respectively. Later, the place where Ou Yezi forged the swords was called "Longyuan," and the lake at the foot of Qinxi Mountain was called "Sword Pool Lake." This story is roughly similar to the record in the *Yue Jue Shu*, but the content is richer and more complete.











Data teknis lengkap
| Model | LQJ-008 |
|---|---|
| Berat | kira-kira: |
| Kategori | Mode & Konsumen |
| Waktu memimpin | 30 hari |
Nilainya nominal pada 20 °C. Unduh lembar data untuk model cad, kurva torsi, dan peta I/O pengontrol.
Di mana ia berjalan
Diukur dan ditugaskan oleh para insinyur TROY.
Diukur dan ditugaskan oleh para insinyur TROY.
Diukur dan ditugaskan oleh para insinyur TROY.
Diukur dan ditugaskan oleh para insinyur TROY.
Pertanyaan pembeli
Apa spesifikasi utama dari LQJ-008?
Berat: kira-kira.:. Lembar data lengkap tersedia berdasarkan permintaan.
Berapa waktu tunggu dan MOQ untuk LQJ-008?
Waktu tunggu adalah 30 hari; MOQ adalah 10 unit.
Bagaimana harga LQJ-008?
Harga dikutip per konfigurasi, termasuk perkakas dan pengangkutan jika berlaku.
Dapatkan proposal harga untuk LQJ-008
Sertakan bagian, target rate dan port tujuan. Seorang insinyur — bukan chatbot — membalas dalam waktu 48 jam.
Kategori yang sama
Kacamata AR
Bank tenaga surya OEM
Kontrol suara helm transformator lebah
Ditinjau oleh TROY Teknik ·. Spesifikasi diperiksa ulang berdasarkan lembar data pemasok di setiap penawaran.