
Machine de fabrication de préservatifs
Le TR-CD01 est un système d'automatisation pour le conditionnement/remplissage. Le délai de livraison est de 75 jours ; le prix est indiqué par configuration. Certifications : Documentation CE sur demande.
- Modèle
- TR-CD01
- Délai de mise en œuvre
- 75 jours
- Catégorie
- Équipement d'automatisation
A quoi sert cette plateforme
Our manufacturer's research and development, design and produce machines of gloves, balloon and condom. Mainly in balloon printing machine, production line for glove, glove half-full dipping, latex condom dipping and latex balloon dipping, glove dotting and printing machine, surgical glove out wrap/inner paper packing machine, condom packing machine and other relevant.
Conditions commerciales
| Devis | Prix par configuration – réponse sous 48 heures |
|---|---|
| Délai de mise en œuvre | 75 jours |
| MOQ | 1 unité |
| Origine | Chine |
| Port de chargement | Shenzhen, Chine |
| Incoterm | FOB Shenzhen/CIF sur demande |
| Paiement | Dépôt de 30%, 70% avant expédition |
| Garantie | 24 mois standard, 36 mois en option |
Détails du produit
Notes d'application, dessins de construction et vidéo du dossier d'ingénierie TROY — la même documentation livrée avec le devis.
Automatic Condom Dipping Production Line
Main functions and features:
This machine is introduced, absorbed, digested, innovated, and self-developed on the basis of current condom packaging machine domestically and abroad, which belongs to the most developed and reliable condom packaging machine presently. The main features of this machine include lower noise, easier adjustment, and longer lifespan for usage after structure innovation and so on. With the functions of finishing material delivery, film delivery, condom lengthening, hot sealing, line cutting, single pack cutting or several packs cutting, oil dripping automatically at a time. We can add the functions of diagram orientation and code spraying according to customers' request, at the same time, we also can reserve the interface for auto condom filling machines to meet the customers' request.
1) Conception automatique entièrement en fonction de la capacité chimique de la matière première
And condom molding craftwork, compact facility flow
2) Selon la théorie de l'air chaud remontant, le four adopte une méthode de séchage en tunnel
pour récupérer le vent chaud en faisant circuler un mélange qui obtient le meilleur effet à la puissance minimale
3) Utiliser l'espace de chauffage efficace et la théorie de la circulation du vent chaud pour réduire
le coût ; Les systèmes de température contrôlés intelligents multi PID font que l'erreur ne peut pas dépasser, même chauffée et une bonne luminosité
4) À haut rendement, conception de joint union spéciale, moule facile à remplacer, reprend la circulaire
speed
5) Automatic vibrant drip or uniform latex system makes condom excellent and uniform
thickness
6) Adopt the special fire resistant chain; pick up yield speed, advanced output

Modèle | TR-CD01 Single line | TR-CD02 Double line |
Size(L*W*H) | 52.2m X 1.5m X 4.5m | 52.2m X 2.3m X 4.5m |
Single line Capacity | 80 -100 million pieces | 160 -200 million pieces |
Latex | Latex 300 ton/year | Latex 500 ton/year |
Electric power | 60kw | 100kw |
Eau | 5ton/hour | 8ton/hour |
Steam | 1.3ton/hour | 2ton/hour |

| Size(L*W*H) | 52.2m X 2.8m X 4.5m |
| Single line Capacity(pcs/Day) | 80000-100000 |
| Heat (Kcal/hr) | 420,000 |
| Latex(ton/year) | 300 |
| Electric power(kw) | 60 |
| Water(ton/hr) | 5 |
| Steam(ton/hr) | 1.3 |

Packing and container:
Non packing , total need 3x40HQ containers

1.Factory Plant: We would like to arrange customer’s factory, complete line and material purchasing or guiding
2.Warranty of product: We will provide spare parts for machine equipments, permanent payable maintenance programe, and one year maintenance for free for electromechanical.And we also will send engineer to cutomer's factory plant by turnkey service.
3.After-sales service of product: Nous tiendrons les clients au courant depuis le début de la production.
4.Document Supports: We have established a data base for all customers since the beginning of production.
5.After complete of engining job: We are able to help our customers train fountain equipment operatr for free.
6.Troubleshooting: Notre service client prendra des mesures immédiatement lorsqu'il recevra un e-mail/message et fournira des instructions professionnelles pour vous aider à résoudre vos problèmes dès que possible.
7.Regular feedback: We will visit the customers again to ask for the suggestion to help improve our quality of service for satified ending users.


Automatic condom production line;
Condom making equipment;
Données techniques complètes
| Modèle | TR-CD01 |
|---|---|
| Délai de mise en œuvre | 75 jours |
| Catégorie | Équipement d'automatisation |
Les valeurs sont nominales à 20 °C. Téléchargez la fiche technique des modèles CAO, des courbes de couple et des cartes d'E/S du contrôleur.
Où ça court
Dimensionné et mis en service par les ingénieurs TROY.
Dimensionné et mis en service par les ingénieurs TROY.
Dimensionné et mis en service par les ingénieurs TROY.
Dimensionné et mis en service par les ingénieurs TROY.
Questions de l'acheteur
Quelles sont les principales spécifications du TR-CD01 ?
Modèle TR-CD01. Une fiche technique complète est disponible sur demande.
Quel est le délai de livraison et le MOQ pour le TR-CD01 ?
Le délai de livraison est de 75 jours ; MOQ est de 1 unité.
Quel est le prix du TR-CD01 ?
Le prix est indiqué par configuration, y compris l'outillage et le transport, le cas échéant.
Obtenez une proposition de prix pour TR-CD01
Incluez la pièce, le débit cible et le port de destination. Un ingénieur (et non un chatbot) répond dans les 48 heures.
Même catégorie
Machine de remplissage de crème quadricolore
Système d'alimentation automatique universel des vis et module de serrage
Machine automatique de fabrication de petits pains TRB-140
Évalué par TROY Ingénierie ·. Les spécifications sont revérifiées par rapport à la fiche technique du fournisseur à chaque devis.